Lahontan Gold Expands Santa Fe Zones with Promising Phase Two Drill Results

Lahontan Gold Corp. reported initial Phase Two drill results at the Santa Fe Mine Project, with significant gold intercepts at York and Slab zones that could expand resources and support an updated Mineral Resource Estimate.

Miami Metrowire Staff
Energy
Lahontan Gold Expands Santa Fe Zones with Promising Phase Two Drill Results

Lahontan Gold Corp. (TSX.V: LG) (OTCQB: LGCXF) announced initial analytical results from its 2025 Phase Two drilling program at the Santa Fe Mine Project in Nevada's Walker Lane, reporting six reverse-circulation drill holes totaling 994 metres that delivered significant gold intercepts at both the York and Slab zones. The results highlight the potential to expand mineralization beyond the current resource pit shell and support an updated Mineral Resource Estimate expected later this year.

The drilling returned a broad intercept of 114.3 metres grading 0.33 g/t gold equivalent at York, including higher-grade mineralization of 18.3 metres grading 0.90 g/t gold equivalent. This intercept expands mineralization north of the current resource pit shell, suggesting the potential for resource growth. At the Slab zone, the company encountered shallow and deeper oxide gold intercepts that may support a deeper conceptual pit and additional resources. The full press release is available at https://ibn.fm/uVpTY.

Lahontan Gold Corp. is a Canadian mine development and mineral exploration company that holds four top-tier gold and silver exploration properties in the Walker Lane of Nevada. Its flagship property, the 26.4 km² Santa Fe Mine project, had past production of 359,202 ounces of gold and 702,067 ounces of silver between 1988 and 1995 from open pit mines utilizing heap-leach processing. The Santa Fe Mine has a Canadian National Instrument 43-101 compliant Indicated Mineral Resource of 1,539,000 oz Au Eq (48,393,000 tonnes grading 0.92 g/t Au and 7.18 g/t Ag, together grading 0.99 g/t Au Eq) and an Inferred Mineral Resource of 411,000 oz Au Eq (16,760,000 tonnes grading 0.74 g/t Au and 3.25 g/t Ag, together grading 0.76 g/t Au Eq), all pit constrained (Au Eq is inclusive of recovery, please see Santa Fe Project Technical Report).

The company plans to continue advancing the Santa Fe Mine project towards production, update the Santa Fe Preliminary Economic Assessment, and drill test its satellite West Santa Fe project during 2025. The technical content of this news release has been reviewed and approved by Michael Lindholm, CPG, Independent Consulting Geologist to Lahontan Gold Corp., who is a Qualified Person as defined in National Instrument 43-101. For more information, visit www.lahontangoldcorp.com.

The latest news and updates relating to LGCXF are available in the company's newsroom at http://ibn.fm/LGCXF.

Blockchain Registration

QR Code for Blockchain Registration